Industrial assembly

realizacjeEDF

  • Realization for Bilfinger Elwo LTD
  • Comprehensive dismantling and assembly works as necessary to upgrade the electrostatic precipitator of the K4 boiler at the EDF Kraków Combined Heat and Power Plant.

more

realizacjeSoda Polska CIECH S.A.

  • Realization for Chemoservis-Dwory INC
  • Construction of a Selective Catalytic Reduction (SCR) installation – assembly of a steel structure and ductwork for the reactor of K1 and K4 boilers.

more

realizacjeTenneco Automotive

  • Arrangement of equipment on the company’s premises
  • Installation of machines to prepare them for operation

more

realizacjeProdlew Kraków

  • Project for Prodlew Kraków
  • Installation work and modernizing the construction of a new facility for the company Kraków Zakłady Odlewnicze ZREMB LTD Nowe Brzesko

more

realizacjeECO

  • Project for ECO INC
  • Construction of an extraction system for the WR-25 boiler in the CHP plant in Opole

more

realizacjeTAURON Ciepło LTD Tychy Manufacturing Plant

  • Realization for Bilfinger Elwo LTD
  • Disassembly and assembly work involving the exchange of the flue incoming to the chimney with adaptation and thermal insulation work

more

Assembly and relocations line

realizacjePlastic Omnium Auto Exteriors

  • Removing the power supply and control infrastructure
  • Implementation of new systems to collect material

more

realizacjeMichelin Polska LTD

  • Dismantling of 4 mixer lines intended for re-use along with system for input and output of rubber with a total mass of about 500 tonnes
  • Secured devices for transport

more

realizacjePehamet LTD

  • Dismantling and moving to storage 3 lines for the packaging of brass and copper pipes
  • Demolition of the old foundations

more

realizacjeChemar Armatura LTD

  • Dismantling of 34 conventional and CNC machine tools
  • Transportation to the new location

more

realizacjeSamsung Poland LTD

  • Removal of the three production lines of coats and door refrigerators
  • Relocation eight-position line gaskets and two wind technology
  • Weight: about 400 tonnes

more

Construction works

realizacjePlastic Omnium Auto Exteriors

  • Supply and assembly of steel structure (48 tons)
  • Perfomance of reinforced concrete works, including supply and erection of pre-fabricated piles
  • Installation of electric wiring system, including indoor and outdoor lighting
  • Construction of access road for heavy commercial vehicles
realizacjeBilfinger ELWO

  • Thermal insulation works on dust extraction system on the boiler WR-25 No. 3 in ECO Opole
realizacjeEklektrobudowa

  • The works included: installation of boiler-rom roof and fixtures/fittings, including catwalks, platforms, railings, staircase, travelling beams.