Plastic Omnium Auto Exteriors

October 10 2013

We were assigned by Plastic Omnium Auto Exteriors to relocate a vacuum feeding system. As part of the project, we transported two silos (with a height of 13 m and diameter of 3 m each) from Germany do Poland and completed assembly tasks in Gliwice including:

  • Disassembly of feeding and control infrastructure
  • Construction of new systems for material receipt
  • Installation of a new control system
  • Installation of a new pneumatic system