June
26
2015
A project carried out on the premises of Soda Polska CIECH SA – welding of structures and plates of reactor ductwork in a newly constructed SCR installation, using the MIG/MAG and MMA processes. A project carried out for Chemoservis-Dwory SA. Construction of a Selective Catalytic Reduction (SCR) installation – assembly of a steel structure and ductwork for the reactor of K1 and K4 boilers