A project carried out on the premises of Soda Polska CIECH SA – welding of structures and plates of reactor […]
Author: fomach
Michelin Polska LTD
In February–May 2015, we disassembled 4 rubber production lines at lMichelin Polska Project tasks: Disassembly of 4 mixer lines intended […]
Chemar Armatura LTD
In June–September 2014, we relocated the works of Chemar Armatura Sp. z o.o. with their production continuity preserved. Project scope: […]
Plastic Omnium Auto Exteriors
We were assigned by Plastic Omnium Auto Exteriors to relocate a vacuum feeding system. As part of the project, we […]
ECO
ECO SA assigned us to install a dust collection system for the WR-25 boiler at their Combined Heat and Power […]
TAURON Ciepło
An on-site project at TAURON Ciepło Sp. z o.o., Tychy Generation Plant: disassembly of the old flue-gas ductwork with disposal […]
PGE Energia
A project carried out at the Combined Heat and Power plant of PGE Energia Ciepła 1st Kraków Branch: disassembling old […]