ECO

August 01 2013
ECO SA - realizacja Fomach

ECO SA assigned us to install a dust collection system for the WR-25 boiler at their Combined Heat and Power plant in Opole.

The project included among others the following construction and mechanical works:

  • Designing and construction of foundations for industrial fans
  • Assembly of a steel structure with ancillary equipment (with a total weight of about 48 tonnes)
  • Design, supply and assembly of electrical wiring, instrumentation, control and automation systems
  • Construction of a dust collection system for the WR-25 boiler at the Combined Heat and Power plant in Opole