Thermal insulation of the dust collection system for WR-25 boiler no. 3 at ECO Opole
Category: Construction works
Plastic Omnium
Supply and assembly of a steel structure (48 tonnes) Reinforced-concrete structures, including supply and installation of prefabricated pillars Installation of […]
Elektrobudowa
Construction of roof of the boiler room and installation of room equipment, such as catwalks, platforms, railing, staircase, hoist beams