FOMACH Sp z 0.0. Sp. K. between August 2013 and January 2014 performed a task related to the installation of dust extraction system of the boiler WR-25 in heat and power plant ECO S.A. in Opole at Harcerska 15.
The project covered:
1) Construction and mechanical works:
- design and construction of foundations for industrial fans
- -assembly of steel structure along with auxiliary devices (total weight – approx. 48 tons)
- -thermal insulation along with protective aluminium sheets
2) Installation of electric wiring system and ICA:
- supply and installation of complete power supply and control system: incomer panel cabinet, control gear cabinet, along with wiring
- integration of new control system with the existing CHANCE 2000 system
The above-mentioned works were performed on time and with utmost diligence.