mgr inż. Wojciech Zachariasiewicz

FOMACH Sp z 0.0. Sp. K. between August 2013 and January 2014 performed a task related to the installation of dust extraction system of the boiler WR-25 in heat and power plant ECO S.A. in Opole at Harcerska 15.
The project covered:

1) Construction and mechanical works:

  •  design and construction of foundations for industrial fans
  • -assembly of steel structure along with auxiliary devices (total weight – approx. 48 tons)
  • -thermal insulation along with protective aluminium sheets

2) Installation of electric wiring system and ICA:

  •  supply and installation of complete power supply and control system: incomer panel cabinet, control gear cabinet, along with wiring
  •  integration of new control system with the existing CHANCE 2000 system

The above-mentioned works were performed on time and with utmost diligence.

 