Sebastian Posmyk

We hereby acknowledge that Fomach sp. z o.o. sp. k. seated in Brzesko, in the period from October 2015 to February 2016 assembled approx. 90 tons of steel structure as part of the contract delivered by Elektrobudowa SA “Redevelopment of the existing stand-by/peak boiler room into light oil-fired boiler room along with infrastructure in EDF Polska S.A. 1st Krakow Branch”.
The works included: installation of boiler-room roof and fixtures/fittings, including catwalks, platforms, railings, staircase, travelling beams. The assembly works included bolting and welding. All welds have been tested in line with applicable requirements. The work commission was performed on time and with due diligence. We recommend Fomach sp. z 0.0. sp. k. as a reliable partner in projects involving assembly of steel structures.

 