August
01
2013
ECO SA assigned us to install a dust collection system for the WR-25 boiler at their Combined Heat and Power plant in Opole.
The project included among others the following construction and mechanical works:
- Designing and construction of foundations for industrial fans
- Assembly of a steel structure with ancillary equipment (with a total weight of about 48 tonnes)
- Design, supply and assembly of electrical wiring, instrumentation, control and automation systems
- Construction of a dust collection system for the WR-25 boiler at the Combined Heat and Power plant in Opole