February
01
2015
In February–May 2015, we disassembled 4 rubber production lines at lMichelin Polska Project tasks:
- Disassembly of 4 mixer lines intended for reuse along with a system for rubber feeding and receipt, a total weight of about 500 tonnes
- Securing the devices for the time of transport
- Loading onto lorries
- Disassembly of selected component devices and systems of the rubber production line to be scrapped. The entire scrapping process took place on site under conditions of an increased risk, using intrinsically safe techniques
About 250 tonnes of devices were disassembled for scrapping.