October
10
2013
We were assigned by Plastic Omnium Auto Exteriors to relocate a vacuum feeding system. As part of the project, we transported two silos (with a height of 13 m and diameter of 3 m each) from Germany do Poland and completed assembly tasks in Gliwice including:
- Disassembly of feeding and control infrastructure
- Construction of new systems for material receipt
- Installation of a new control system
- Installation of a new pneumatic system