In the period between 10-10-2013 and 23-10-2013, FOMACH ca rried out relocation of pressure feed system, including: transport of two silos (13m high, 3 m in diameter) from Germany to Poland, assembly works in Gliwice, including:

  • disassembly of feed and control infrastructure
  • assembly of new mate rial in-ta ke systems
  • assembly of new control system
  • assembly of new pneumatic system

When performing the above-mentioned works FOMACH demonstrated reliability and very good work organisation.
Adequate coordination and organisational skills as well as well-qualified staff of FOMACH significantly contributed to successful relocation.

 