In the period between 10-10-2013 and 23-10-2013, FOMACH ca rried out relocation of pressure feed system, including: transport of two silos (13m high, 3 m in diameter) from Germany to Poland, assembly works in Gliwice, including:
- disassembly of feed and control infrastructure
- assembly of new mate rial in-ta ke systems
- assembly of new control system
- assembly of new pneumatic system
When performing the above-mentioned works FOMACH demonstrated reliability and very good work organisation.
Adequate coordination and organisational skills as well as well-qualified staff of FOMACH significantly contributed to successful relocation.
DOWNLOAD REFERENCES