Soda Polska CIECH S.A.
A project carried out on the premises of Soda Polska CIECH SA – welding of structures and plates of reactor […]

Michelin Polska LTD
In February–May 2015, we disassembled 4 rubber production lines at lMichelin Polska Project tasks: Disassembly of 4 mixer lines intended […]

Chemar Armatura LTD
In June–September 2014, we relocated the works of Chemar Armatura Sp. z o.o. with their production continuity preserved. Project scope: […]

Pehamet Sp. z o.o.
In May–June 2014, we relocated production in the Pehamet Sp. z o.o. works. Project scope: Demolition of old foundations, Construction of new […]
Bilfinger
Thermal insulation of the dust collection system for WR-25 boiler no. 3 at ECO Opole
Plastic Omnium
Supply and assembly of a steel structure (48 tonnes) Reinforced-concrete structures, including supply and installation of prefabricated pillars Installation of […]
Elektrobudowa
Construction of roof of the boiler room and installation of room equipment, such as catwalks, platforms, railing, staircase, hoist beams
Warning: Trying to access array offset on value of type bool in /home/users/fomach/public_html/fomach/wp-includes/media.php on line 795
Warning: Trying to access array offset on value of type bool in /home/users/fomach/public_html/fomach/wp-includes/media.php on line 801

Plastic Omnium Auto Exteriors
We were assigned by Plastic Omnium Auto Exteriors to relocate a vacuum feeding system. As part of the project, we […]

ECO
ECO SA assigned us to install a dust collection system for the WR-25 boiler at their Combined Heat and Power […]

TAURON Ciepło
An on-site project at TAURON Ciepło Sp. z o.o., Tychy Generation Plant: disassembly of the old flue-gas ductwork with disposal […]